Case Study

Tāwhaki National Aerospace Centre Aircraft Hangar

  • Location
    Kaitorete, Canterbury
  • Client
    Tāwhaki National Aerospace Centre (Joint venture between Kaitorete mana whenua and the New Zealand Government)
  • Architect
    South Architects
  • Structural Engineer
    PTL Structural & Fire
  • Builder
    Tuatara Structures, WAL Construction
  • Date
    2025
  • Photo Credits
    Techlam, Wayne Eddington (Tuatara Structures), Tāwhaki National Aerospace Centre

Engineered timber solution for 30m clear-span aviation structure

Our Challenge
The Tāwhaki National Aerospace Centre required a new 600m² aircraft hangar with a 30-metre clear span with no internal supports. The project demanded high structural performance comparable to steel while meeting stringent sustainability objectives and aesthetic requirements for this high-profile aerospace facility. Critical design parameters included load-bearing capacity for aircraft storage, fire performance compliance, integration with the site's environmental zoning requirements and respect for the whānau-led, land-based design context.

The Techlam Solution
Techlam supplied prefabricated glulam portal frames featuring CNC-machined 15-metre portal beams engineered to create the required 30-metre clear span. The solution incorporated bespoke connection hardware and specialised timber connectors designed for the high-load aerospace application. All components were precision-manufactured off-site and delivered pre-cut, pre-finished and ready for assembly, ensuring tight tolerances and minimising on-site construction complexity. The glulam specification provided comparable load-bearing performance to steel while delivering predictable fire charring rates and enhanced acoustic properties suitable for the aviation environment.

Products Used
01

Glulam Portals

Glulam portals offer predictable fire performance through controlled charring rates, with precision cutting ensuring tight tolerances and optimal structural performance while reducing on-site construction time and waste and require minimal maintenance.

02

Pre-fabrication

Reducing on-site time and costs with ready-to-assemble components, including specialised connection hardware and bespoke timber connectors.

Jordan Frizzell

Founder and Managing Director

Tuatara Structures

“The close coordination with Techlam and early contractor engagement was critical to the project's success.”

“Structurally, glulam performed comparably to steel in terms of load-bearing capacity. Components from Techlam arrived pre-cut, pre-finished, and ready for assembly, which reduced waste and ensured tight tolerances, while the timber's predictable charring rates in fire made it a competitive choice for the hangar's structural framework. ”