Our Challenge
This project specified tight delivery times and accurate pre-cutting and slotting of the curved timbers. All components had to be pre-assembled and checked for accuracy before being coated with two coats of stain and packed into containers for shipment.
The Techlam Solution
Techlam supplied all structural laminated components pre-tested for fit and accuracy. Both stages of the project (consisting of the main auditorium and a large colonnade) were packed, shipped and installed on site. Set in a world class location, the finished project looks stunning and fits perfectly with its surroundings.
Jason McCarthy
Project Manager
Arrow International (NZ) Limited