Papakura District Courthouse

  • Location
    Papakura, Tāmaki Makaurau Auckland
  • Client
    Ministry of Justice
  • Architect
    Architectus
  • Builder
    Southbase Construction
  • Installer
    ZYJ
  • Merchant
    CARTERS Albany
  • Date
    2026

Structural glulam that gives a modern courthouse its civic presence

Our Challenge
Papakura’s existing courthouse had reached the end of its life and the Ministry of Justice needed a modern, healthy replacement delivered on a tight timeframe. Although largely modular, the new building had to carry the dignity expected of a justice facility and avoid any sense of a “temporary” structure. The entry forecourt and verandah were central to that. They needed to provide a welcoming, covered approach for court users, frame mahi toi by mana whenua artists and give the courthouse a strong civic presence from the street.

The Techlam Solution
Techlam supplied the structural glulam columns and beams that form the verandah portal frames along the building’s frontage and entry walkway. Visual appearance grade glulam was manufactured with precision at our Levin plant and delivered with connections pre-drilled, so the verandah could be installed quickly and keep pace with the modular build. The exposed timber brings warmth and natural texture to the entrance and provides a strong backdrop for the mahi toi panels. It gives the courthouse a grounded, permanent character from the street.

Products Used
01

Glulaminated Visual Appearance Grades

Glulam columns and beams were used for the verandah portal frames, chosen for their structural strength, dimensional stability and natural appearance in a high-profile public entrance.

02

Pre-fabrication

Components were manufactured off-site and delivered pre-drilled ensuring precise fit and fast installation that kept pace with the build.

Roger O’Brien

Senior Site Manager

Southbase Construction

“We were really happy with the product. The quality was good, and the finished timber looked excellent with three protective coats on it. Shane at Techlam was easy to deal with and always came back to us with answers in good time.”

“The members arrived on site prefabricated and pre-drilled, and there were no issues with transport. With a crane, we got about 90% of the install done in a single day. All the CNC-drilled holes lined up with our steel brackets and plates. The only change we made was reworking the back of one post to suit a site constraint, which was approved beforehand.”